Case studies

Transitions faced and resolved

Four interim management assignments in Italian mid-sized companies and groups with an international footprint. Different contexts, one common outcome: objectives achieved and the company left self-reliant, with no need for further intervention.

Automotive and telecoms · 2002–2003

FIAMM

SAP consolidation and IT outsourcing · Interim Manager reporting directly to the CEO

80%SAP consolidation within months
6vendors in the tender
1 yearassignment length

Context

A family-owned mid-sized company from the Veneto region, headquartered in Vicenza, with five local plants and sites in Italy, the Czech Republic, France and the USA. Car batteries, horns, automotive components and telecoms; advanced kanban plants coexisted with formerly state-owned units.

Challenge

A forced SAP implementation had caused operational problems across functions and territories, no economic benefits or synergies, an overloaded IT organisation and local customisations that had escaped central control.

Intervention

Four objectives: consolidate SAP, strengthen IT, deliver economic benefits, pilot e-business. In the first 100 days the problems were identified at three levels (technical, process, organisational). A competitive tender among six vendors followed for infrastructure outsourcing, with five-year contracts negotiated, plus a new IT governance model with greater user involvement.

Results

  • 80% of SAP consolidation completed by the summer
  • Infrastructure outsourced under five-year contracts
  • Exit after one year with no need for further intervention
Shipbuilding and yachting · 2003–2004

Ferretti Group

New group information system · Interim Manager with full responsibility for Group IT

-40%SAP budget vs. offers received
~€400Mgroup turnover
1 yearassignment length

Context

A leading luxury yacht group that had grown turnover and headcount tenfold in eight years: around 300 boats a year, a “fleet” of brands controlled by a holding company, an international presence and ownership shared among a fund, management and the family.

Challenge

Growth through acquisitions had made integration difficult. The AS/400-based information system, neither integrated nor scalable, employed 15 people at €1.5 million a year without providing adequate visibility of business data.

Intervention

A three-phase plan: review of the existing setup (one month), selection of the solution and implementation team (5–6 months), implementation of the first application wave. SAP was chosen, with an investment negotiated to include specific know-how for the yachting industry.

Results

  • Complete solution blueprint by year end and go-live in 2004
  • Made-to-order and series production reconciled, across business units with different volumes and complexity
  • Change management objectives achieved; operations handed over to an internal manager
Food & Beverage · 2004–2006

STAR

Integrated logistics and IT outsourcing · Check-up followed by a two-year assignment

-50%application maintenance cost
15satellite systems rationalised
27 monthsassignment length

Context

A historic, family-owned Italian food brand. Rather than joining an international group, the company had chosen to integrate and diversify its offer, rationalising its brand portfolio and outsourcing part of its production and logistics chain.

Challenge

Supply chain integration and greater responsiveness were needed. Processes had been optimised in isolation, with no overall view of IT. Management wanted to review the JD Edwards ERP three years after go-live, recover efficiency and decide what to outsource.

Intervention

A 5-day on-site check-up plus 3 days of analysis: no immediate serious issues, but medium-term concerns over the proliferation of satellite systems. This led to a two-year assignment with three guidelines: a new integrated logistics system, infrastructure outsourcing and optimised application maintenance.

Results

  • A logistics solution sized to actual volumes, absorbing most of the 15 satellite systems
  • Infrastructure outsourced in 2004, application maintenance in 2005 at roughly 50% lower cost
  • Internal IT team reduced to 6 people on distinctive processes; exit after 27 months
Packaging · 2007–2008

SEDA Group

Check-up and bridge management of group IT · Interim Manager for 9 months

8days of check-up
13companies, 12 plants
9 monthsassignment length

Context

An international leader in paper and plastic containers for the food and non-food sectors: 13 companies (7 in Italy, 6 in Europe), 12 plants and around 1,700 employees. The family's second generation had started strengthening the management team.

Challenge

An AS/400 information system with outdated in-house developments, inadequate networks, weak control over subsidiaries in the UK, Germany and Portugal, an unstructured IT function without a budget, over half of IT activity absorbed by routine maintenance, duplicated costs.

Intervention

An in-depth check-up: 8 days at headquarters with interviews and plant visits, analysis of systems and technologies, a technical and economic survey of the three foreign subsidiaries. The report proposed three alternative scenarios and explicitly advised against some options the company had been considering.

Results

  • Bridge management of corporate IT and rationalisation of critical processes ahead of the ERP project
  • Subsidiaries' outsourcing contracts renegotiated; network and telecoms upgraded; IT organisation and budget defined
  • New Group IT Director selected and coached, followed by an exit with full IT autonomy

Other clients: Poste Italiane, Finmeccanica, Tenaris-Dalmine, Alessi, Mondi, Battistero, Novelli. A full list of references is available on request.